Legrand Distribution Boards in Saudi Arabia

Saudi Control Panels Company is an authorised Legrand partner that assembles Legrand distribution boards in Saudi Arabia, building XL3 enclosures with DX3 and DPX3 breakers for buildings and plants at its Dammam workshop. Each board is verified to IEC 61439. Distribution boards typically take 1–2 weeks.

What you receive: a written proposal listing the Legrand enclosure, breakers and accessories, the standard, the lead time and the price, issued within one working day of your schedule or single-line diagram. Request a quotation

Legrand XL3 distribution board with DX3 and DPX3 breakers assembled in Saudi Arabia

What is the price of a Legrand distribution board?

It depends on the enclosure size, breaker count and ratings, the busbar, the form of separation and the testing required. Specifications from consultants often list a price schedule item by item. As an authorised Legrand partner we price enclosure, breakers and labour together from your schedule. Send the circuit list and the proposal shows each line, so you can compare it with an alternative make.

Legrand distribution boards in Saudi Arabia: what we deliver

Panel Rating Standard Lead time
Distribution boards Up to 800 A IEC 61439-1/-3 1–2 weeks
LV switchboards / MDB / SMDB Up to 6,300 A, 380–415 V 60 Hz, Form 1–4b, up to 100 kA short-circuit rating per design verification IEC 61439-1/-2 3–5 weeks
Replacement and extension boards Matched to the existing layout where possible IEC 61439-1/-3 1–2 weeks
Factory acceptance test In-house routine verification; customer or third-party witness welcome IEC 61439-1/-2 Included

Which Legrand ranges do we assemble?

  • XL3 modular enclosures and chassis for distribution boards.
  • DX3 miniature and residual-current breakers for final circuits.
  • DPX3 moulded-case breakers for incomers and feeders.
  • DMX3 air circuit breakers where an incomer needs a larger frame.
  • Busbar supports, barriers and accessories from the same system.

Where your consultant specifies Legrand, we follow the schedule, ratings and cable-entry notes on the drawing. Boards above the distribution-board range move to our LV switchboards and MDB scope, with the same breaker families.

How is a Legrand board built, tested and delivered?

  1. Enquiry. You send the schedule, diagram or board photographs.
  2. Selection. We choose enclosure size, busbar and breakers.
  3. Approval. The layout and schedule go to you.
  4. Build. Chassis, busbars, breakers and wiring are assembled.
  5. Test. Routine verification is recorded; witnesses are welcome.
  6. Delivery. The board goes to site in any region.
  7. Handover. Circuit labels, drawings and the test record follow.

Where our Legrand boards are used

Saudi Control Panels Company was established in 2000 and is approved by Saudi Aramco, SABIC and the Royal Commission for Jubail and Yanbu. We have worked on projects for Saudi Electricity Company in Jeddah and for Saudi Aramco in Jubail. ISO 9001, ISO 14001 and ISO 45001 cover the work, and the Dallah Industrial workshop in Dammam builds more than 150 panels a month. Existing boards are handled under panel modification and retrofit, and the partners page lists other brands.

Legrand distribution board questions

Who builds Legrand distribution boards in Saudi Arabia?

Saudi Control Panels Company provides Legrand-based distribution boards assembled in Dammam and delivered across the Kingdom. We are an authorised Legrand partner, with Saudi Aramco, SABIC and Royal Commission approvals behind the workshop.

Is there a Legrand supplier in Riyadh?

We assemble Legrand boards in Dammam and deliver them to Riyadh and every other region, with the test record and drawings. Send the schedule and the proposal states the delivery arrangement for your site.

What affects the cost of a Legrand distribution board?

Enclosure size, breaker count and ratings, busbar, form of separation, accessories and testing set the price. A larger incomer frame adds more than extra outgoing ways. The proposal itemises each factor from your schedule.

How long does a Legrand board take?

Distribution boards typically take 1–2 weeks, and switchboards 3–5 weeks. Drawing approval and breaker supply set the date, so we confirm availability of the main devices as soon as the schedule is signed off.

Who is the Legrand distributor in Saudi Arabia?

Saudi Control Panels Company provides finished boards built from Legrand devices, which Legrand sells through its own offices and distributors. We buy the devices for each build and assemble them into verified boards, so you receive one finished assembly with one set of documents.

What should I send to get a quotation?

Send the circuit schedule or single-line diagram, the Legrand references if the specification lists them, the short-circuit level, the IP rating and the delivery location. Photographs help when the new board must match an existing one.


Looking for Legrand distribution boards in Saudi Arabia? Send your schedule or diagram and receive a quotation within one working day.