Eaton Panel Builder in Saudi Arabia
Saudi Control Panels Company is an authorised Eaton partner and an Eaton panel builder in Saudi Arabia, assembling LV switchboards, MCC panels and control panels around NZM breakers and Eaton motor-control gear in Dammam. Designs are verified to IEC 61439 and tested in the workshop. Switchboards typically take 3–5 weeks.
What you receive: a written proposal listing the Eaton devices, standard, lead time and price, issued within one working day of your single-line diagram or panel schedule. Request a quotation

What are the different types of electrical panel boards?
Four types cover most plants: main distribution boards that take the incoming supply, sub-distribution boards for areas, motor control centres for starters and drives, and control panels for automation. As an authorised Eaton partner we build all four around Eaton equipment. Our LV switchboards and MDB and distribution boards pages show how each is rated and separated.
Eaton panel builder in Saudi Arabia: what we deliver
| Panel | Rating | Standard | Lead time |
|---|---|---|---|
| LV switchboards / MDB / SMDB | Up to 6,300 A, 380–415 V 60 Hz, Form 1–4b, up to 100 kA short-circuit rating per design verification | IEC 61439-1/-2 | 3–5 weeks |
| Distribution boards | Up to 800 A | IEC 61439-1/-3 | 1–2 weeks |
| MCC panels | Fixed or withdrawable, up to 4,000 A busbar, DOL, star-delta, soft-starter or VFD feeders | IEC 61439-1/-2 | 4–6 weeks |
| Custom, pump, ATS and VFD panels | To specification | IEC 61439-1/-2, IEC 60204-1 | 2–4 weeks |
| Factory acceptance test | In-house routine verification; customer or third-party witness welcome | IEC 61439-1/-2 | Included |
Which Eaton equipment do we assemble?
- xEnergy-style low-voltage arrangements where the specification names the system.
- NZM moulded-case breakers for incomers and large feeders.
- PKZ motor-protective breakers and DIL contactors for MCC feeders.
- PowerXL drives in ventilated VFD sections.
- easyE4 control relays for compact automation panels.
When the document says Eaton and nothing more, we draw the device list and send it for approval. When it names a complete system, the proposal states what we supply and what the system owner supplies, so there is no surprise at delivery.
How is an Eaton-based panel built and delivered?
- Enquiry. Diagram, schedule or OEM drawings reach us.
- Device list. Each Eaton device appears by reference and rating.
- Approval. Layout and schematics go to you.
- Build. Busbars, devices and wiring follow the approved set.
- Test. Routine verification is recorded; witnesses are welcome.
- Delivery. The board is dispatched to any region.
- Handover. As-built drawings and breaker settings accompany it.
Our footing with Eaton-based work
Saudi Control Panels Company was established in 2000 and is approved by Saudi Aramco, SABIC and the Royal Commission for Jubail and Yanbu. We have worked on projects for Saudi Electricity Company in Jeddah and for the Royal Commission in Jizan. ISO 9001, ISO 14001 and ISO 45001 govern the work, and the Dallah Industrial workshop in Dammam builds more than 150 panels a month. Our custom control panels page covers one-off designs, and the partners page lists the other brands.
Eaton panel builder questions
Who is an Eaton panel builder in Saudi Arabia?
Saudi Control Panels Company provides Eaton-based switchboards, MCC and control panels from its Dammam workshop. We are an authorised Eaton partner, we have built panels since 2000, and we hold Saudi Aramco, SABIC and Royal Commission approvals.
What does Eaton do?
Eaton is a power management company that makes breakers, switchgear, motor-control gear, drives and controls. Panel builders turn those devices into finished assemblies. We buy the Eaton parts, add busbars, wiring and enclosure, test the board and supply the documents.
What affects the cost of an Eaton-based panel?
Breaker frame size, fault level, form of separation, feeder count, drive ratings, enclosure and IP rating, and the witness-test plan set the price. Specifying one make across the board reduces spares variety. The proposal prices each factor.
How long does an Eaton-based panel take?
Switchboards typically take 3–5 weeks, MCC panels 4–6 weeks and distribution boards 1–2 weeks. The clock starts at drawing approval, and the proposal flags any device with a longer supply time.
Can you work to a UL-style specification?
Most Saudi projects specify IEC 61439, and that is our standard. If your document asks for a different code or listing, send it with the enquiry and the proposal states what we build, what we propose instead and what must come from the specifier.
What should I send to get a quotation?
Send the diagram or panel schedule, the Eaton references if the document lists them, the short-circuit level, the IP rating and the delivery location. Include any site spares you want matched.
Looking for an Eaton panel builder in Saudi Arabia? Send your drawings or schedule and receive a quotation within one working day.
