Control Panels for Food and Beverage Factories in Saudi Arabia
Saudi Control Panels Company builds control panels for food and beverage factories in Saudi Arabia: stainless steel washdown panels, MCC panels, VFD panels and distribution boards for dairies, bakeries, beverage lines, cold stores and packing halls. Stainless and washdown panels typically take 3 to 5 weeks, and each leaves our Dammam workshop with a signed test record.
What you receive: a written proposal showing the enclosure material, ingress rating, panel ratings, delivery time and price, issued within one working day of your single-line diagram, panel schedule or room layout. Request a quotation

What makes a food factory panel different from a standard panel?
The room decides the build. Production halls are cleaned with water, foam and chemicals every shift, so a panel there must shed water and resist corrosion. Cold rooms add condensation, and packing halls add dust and fine product powder. A painted mild steel cabinet fails in a year in some of these areas, and a leaking door seal can stop a line.
Four features set a hygienic panel apart:
- stainless steel SS304 or SS316 enclosures with smooth, continuously welded seams;
- a sloped roof and no flat surfaces where water or powder can settle;
- IP65 or IP66 sealing with gaskets suited to the cleaning chemicals; and
- cooling that does not open the enclosure to the washdown spray.
Control panels for food and beverage: what we build
| Panel | Range / specification | Standard | Typical lead time |
|---|---|---|---|
| Stainless steel washdown panels | SS304 or SS316, IP55–IP66 | IP code to IEC 60529; IEC 61439-1/-2 | 3–5 weeks |
| MCC panels for utilities and lines | Fixed or withdrawable, up to 4,000 A busbar, DOL, star-delta, soft-starter and VFD feeders | IEC 61439-1/-2 | 4–6 weeks |
| VFD and machine control panels | To specification, custom control panels for fillers, conveyors and mixers | IEC 60204-1 | 2–4 weeks |
| Distribution boards | Up to 800 A | IEC 61439-1/-2 | 1–2 weeks |
| LV switchboards | Up to 6,300 A, 380–415 V 60 Hz, Form 1–4b, short-circuit rating up to 100 kA (per design verification) | IEC 61439-1/-2 | 3–5 weeks |
| Factory acceptance test | In-house routine verification; customer witness welcome | IEC 61439-1/-2 | Included in build time |
We build with ABB, Schneider Electric and Siemens components in Rittal enclosures, and our stainless fabrication is covered in the page on stainless steel and outdoor panels. Enclosure welding is carried out by personnel qualified to ASME, AWS and DIN EN.
Should a food factory panel be stainless steel 304 or 316?
Use SS304 in dry areas and SS316 wherever chlorides, salt or strong cleaning chemicals reach the panel. SS304 suits an electrical room or a clean packing hall. SS316 contains molybdenum and resists chloride attack, which makes it the safer choice in coastal sites, in brine and fish processing, and in areas where chlorinated cleaners are used. The price difference is small compared with a panel replacement, so we often recommend SS316 for any wet or coastal area.
Painted Rittal or local enclosures remain the right choice in a dry electrical room, away from the production floor. We fit them in a separate room whenever your layout allows, to keep the wet areas free of large cabinets.
How do you keep drives and motor starters cool inside a sealed panel?
Remove the heat without letting water in. A sealed IP66 stainless panel cannot use open fans, so cooling comes from an enclosure air-conditioning unit or a heat exchanger, selected from a calculation of the drive losses and the room temperature. Where the starters can move to a dry electrical room, the heat problem disappears. We discuss the layout with you at the quotation stage, because moving a VFD panel out of the wet area is often the cheapest fix.
How are food factory panels built, tested and delivered?
- Enquiry. You send the single-line diagram, panel schedule and the room layout.
- Review. We confirm the enclosure material, IP rating and cooling for each area.
- Design. General arrangement and wiring drawings are issued for approval.
- Build. Stainless enclosures are fabricated and panels assembled in Dammam.
- Factory acceptance test. We check wiring, insulation, protection, door seals and interlocks. See FAT and testing.
- Delivery. Panels are wrapped to protect the finish and delivered to site.
- Documentation. You receive as-built drawings and test records for your quality file.
We have worked in Saudi Arabia since 2000, and our quality, environmental and safety systems are certified to ISO 9001, ISO 14001 and ISO 45001. Our our Dallah Industrial workshop in Dammam builds more than 150 panels a month. We serve factories in the Dammam industrial cities and across Saudi Arabia.
Food and beverage control panel questions
Who provides control panels for food and beverage factories in Saudi Arabia?
Saudi Control Panels Company provides stainless washdown panels, MCC and VFD panels from its Dammam workshop, built with ABB, Schneider Electric and Siemens components. We build to your layout and your hygiene requirements.
What affects the cost of a washdown control panel?
The main factors are enclosure size, stainless grade (SS304 or SS316), the IP rating, the cooling method, the component make and the quantity of feeders. Send your single-line diagram and room layout and the proposal prices each item.
How long does a stainless steel control panel take?
Stainless and outdoor panels typically take 3 to 5 weeks, and distribution boards 1 to 2 weeks. Fabrication of the stainless enclosure is the longest step, and drawing approval is the biggest variable on your side.
Can you meet our HACCP or customer audit requirements?
Yes. We supply the documentation an audit asks for: material records for the stainless enclosure, the signed test record, drawings and a list of installed components. Tell us the audit scheme and we match the document pack.
Is IP66 enough for daily high-pressure washdown?
Yes, for standard cleaning, when the panel is also built with a sloped top, sealed cable entries and gaskets suited to your chemicals. For very close, high-pressure jetting, tell us the distance and pressure so we can specify the seal and cable glands to suit.
What should I send to get a quotation?
Send the single-line diagram, panel schedule and the room layout showing where each panel will stand. Add the cleaning method and any audit requirements. We confirm scope, lead time and price within one working day.
Looking for control panels for food and beverage factories in Saudi Arabia? Send your single-line diagram and room layout, and a quotation reaches you within one working day.
