Panel Supplier for EPC Contractors in Saudi Arabia
Saudi Control Panels Company is a panel supplier for EPC contractors in Saudi Arabia, delivering LV switchboards, MCC panels and control panels with the submittals, test records and delivery dates your project schedule needs. We are approved by Saudi Aramco, SABIC and the Royal Commission, and typical lead times run from 2 to 6 weeks after drawing approval.
What you receive: a written proposal with a priced panel list, a compliance statement against the specification, a submittal schedule and delivery dates, issued within one working day of your enquiry package. Request a quotation

What does an EPC contractor need from a panel vendor?
An EPC contractor needs the vendor's paperwork to arrive on time as much as the panels. Your programme has a date for vendor drawings, a date for consultant comments, a date for the factory test and a date for delivery to the site. A vendor who misses the first one usually misses the last. We therefore commit to the documents first, and then to the hardware.
What a project team usually asks for:
- priced tender responses against the bill of quantities, with a clear list of deviations;
- general arrangement drawings, single-line diagrams and data sheets for review;
- an inspection and test plan before the build starts;
- a witnessed factory test, attended by your engineer, the consultant or a third-party inspector; and
- as-built drawings, test records and manuals for the handover file.
Panel supplier for EPC contractors: what we deliver
| Panel | Rating | Standard | Lead time |
|---|---|---|---|
| LV switchboards / MDB / SMDB | Up to 6,300 A, 380–415 V 60 Hz, Form 1–4b, short-circuit rating up to 100 kA (per design verification) | IEC 61439-1/-2 | 3–5 weeks |
| MCC panels | Fixed or withdrawable, up to 4,000 A busbar, DOL, star-delta, soft-starter and VFD feeders | IEC 61439-1/-2 | 4–6 weeks |
| Custom control, pump, ATS and VFD panels | To specification | IEC 61439-1/-2; IEC 60204-1 | 2–4 weeks |
| Distribution boards | Up to 800 A | IEC 61439-1/-2 | 1–2 weeks |
| Submittals | Drawings, data sheets, compliance statement, inspection and test plan | Project specification | Issued before build |
| Factory acceptance test | In-house routine verification; consultant, client or third-party witness welcome | IEC 61439-1/-2 | Included in build time |
We build with ABB, Schneider Electric and Siemens components in Rittal enclosures, chosen from the approved-make list in your specification.
How do submittals and approvals work for a panel order?
Submit early, answer comments fast and freeze the design before cutting metal. We issue general arrangement drawings and the single-line diagram within days of the order, and we track the consultant's comments in a log so each revision is traced to a comment. Fabrication starts when you release the drawings, not before, so you never pay for rework on a design that has not been approved. See panel design and drawings for the deliverables list.
Saudi Control Panels Company is approved by Saudi Aramco, SABIC and the Royal Commission for Jubail and Yanbu, and we have worked on projects for all three. Contractors working for those clients can read how vendor-listed jobs are handled on our page for an Aramco and SABIC approved panel manufacturer.
How do you protect the project schedule?
By stating the dates in the proposal and then working to them. The proposal lists the submittal date, the build period, the factory test date and the delivery date, counted from drawing approval. If your site is not ready for the panels, we can hold completed panels in the workshop and deliver in phases, so you do not need to find storage on site. For large jobs, panels are tested and released in groups, so the first groups reach site while the last are still on the floor.
Our Dallah Industrial workshop in Dammam builds more than 150 panels a month, so a job with many boards can run in parallel instead of in sequence.
How are panels for an EPC project built and delivered?
- Enquiry. You send the specification extracts, panel schedule and single-line diagrams.
- Proposal. We return prices, deviations and the dated schedule.
- Submittals. Drawings and data sheets go for review, and comments are logged.
- Build. Panels are assembled after drawing release.
- Factory acceptance test. Your engineer or inspector witnesses it. See FAT and testing.
- Delivery. Panels are packed and delivered to site in agreed groups.
- Documentation. The handover file includes as-built drawings, test records and manuals.
We deliver to projects in all regions of Saudi Arabia, including Jubail and Yanbu. Details for Jubail projects are on their own page.
EPC panel supplier questions
Who is a panel supplier for EPC contractors in Saudi Arabia?
Saudi Control Panels Company provides switchboards, MCC panels and control panels to EPC contractors from its our Dallah Industrial workshop in Dammam, built with ABB, Schneider Electric and Siemens components. We hold ISO 9001, ISO 14001 and ISO 45001 certification.
What affects the cost of panels for an EPC project?
The main factors are ratings and short-circuit levels, the number of sections and feeders, approved-make requirements, the enclosure and IP rating, the witness testing and documentation demanded, and the delivery programme. Send the panel schedule and specification extracts and the proposal prices each panel.
How long does panel delivery take on an EPC project?
Typical lead times run from 2 to 6 weeks after drawing approval, with distribution boards at 1 to 2 weeks and MCC panels at 4 to 6 weeks. The proposal also gives the submittal, test and delivery dates against your programme.
Can you respond to a tender in a short time?
Yes. We issue a priced response with deviations within one working day of receiving the enquiry package. If the tender needs clarification before pricing, we send a short list of questions on the same day.
Can you support our consultant's specification and comments?
Yes. We review the specification, return a compliance statement, answer every consultant comment in a log and revise the drawings until they are approved. Fabrication starts only on drawings you have released.
What should I send to get a quotation?
Send the panel schedule, single-line diagrams and the specification sections for the panels. Add the programme dates that matter. We confirm scope, lead time and price within one working day.
Need a panel supplier for EPC contractors in Saudi Arabia? Send us your enquiry package, and a priced proposal with a dated schedule reaches you within one working day.