Elcontrol Panel Energy Meters in Saudi Arabia
Saudi Control Panels Company is the authorised Italian technology partner for Elcontrol Energy Net equipment, fitting Elcontrol panel energy meters in Saudi Arabia into switchboards, MCC sections and distribution boards at its Dammam workshop. Metering is specified at design stage, cut into the door and wired before the factory test. Switchboards typically take 3–5 weeks.
What you receive: a written proposal naming each Elcontrol meter, its CT ratio and cut-out, the standard, the lead time and the price, issued within one working day of your single-line diagram. Request a quotation

Which Elcontrol meter fits a switchboard door?
Door-mounted multifunction meters usually follow the 96 × 96 mm panel cut-out, such as the VIP96 and VIP396 families. They read voltage, current, power, energy and power factor from current transformers on the incomer or feeder. As the authorised Italian technology partner we choose the model with you from the loads on the drawing. Compact DIN-rail analysers suit boards where door space is short, and a communication port allows the reading to reach a BMS or SCADA.
Elcontrol panel energy meters in Saudi Arabia: what we deliver
| Panel | Rating | Standard | Lead time |
|---|---|---|---|
| Metering in LV switchboards / MDB | Incomer and feeder meters with CTs, to the switchboard ratings up to 6,300 A | IEC 61439-1/-2 | 3–5 weeks |
| Metering in MCC panels | Group and feeder meters on withdrawable or fixed MCC, up to 4,000 A busbar | IEC 61439-1/-2 | 4–6 weeks |
| Metering in distribution boards | Up to 800 A | IEC 61439-1/-3 | 1–2 weeks |
| Factory acceptance test | In-house routine verification; customer or third-party witness welcome | IEC 61439-1/-2 | Included |
Does an Elcontrol panel meter support Modbus?
Communication options differ by model, so we read the datasheet for the meter you specify and state the protocol, port and register map in the proposal. Where a Modbus link is needed, the cable route, terminal and screen arrangement are drawn in the schematic and tested at FAT. Our panel design and drawings team shows CT locations and fusing on the single-line diagram, so the meter and the board are approved together.
How is Elcontrol metering built into a panel?
- Enquiry. You mark metering points on the diagram.
- Selection. We pair meter model, CT ratio and accuracy class.
- Drawing. Door cut-outs and CT wiring appear in the schematic.
- Build. Meters are fitted, CTs mounted and test blocks wired.
- Test. Readings are injected and checked at the factory acceptance test.
- Delivery. The board ships with meter settings recorded.
- Records. CT ratios and addresses are listed in the handover file.
Where metering panels go to work
Saudi Control Panels Company has built panels since 2000 and is approved by Saudi Aramco, SABIC and the Royal Commission for Jubail and Yanbu. We have worked on projects for Saudi Electricity Company in Jeddah and for MODON in Dammam. ISO 9001, ISO 14001 and ISO 45001 cover the work, and more than 150 panels a month leave the Dallah Industrial workshop. Metered boards sit inside our LV switchboards and MCC panels; the partners page lists the other brands.
Elcontrol panel meter questions
Who fits Elcontrol panel energy meters in Saudi Arabia?
Saudi Control Panels Company provides Elcontrol metering inside switchboards, MCC and distribution boards, built in Dammam. We are the authorised Italian technology partner for Elcontrol, and the work is documented from drawing to factory test.
Where can I buy Elcontrol in Saudi Arabia?
Ask us when the meters are part of a switchboard or MCC. We supply them fitted, wired to current transformers and tested, so you receive a finished board rather than loose instruments. Standalone requirements can be discussed through the same enquiry.
What affects the cost of panel metering?
Meter model, number of metering points, CT ratio and accuracy class, communication options and door space set the price. Panels with a metering section for each feeder cost more than one with incomer metering only. Send the diagram for an itemised proposal.
How long does a metered panel take?
Switchboards typically take 3–5 weeks, MCC panels 4–6 weeks and distribution boards 1–2 weeks. Metering adds drawing detail rather than workshop time, so early approval of CT ratios and meter models protects the date.
Can meters be added to an existing board?
Yes. Send photographs and the existing diagram. We design the CT positions and door cut-outs, build the work in the workshop where possible and plan the outage with your maintenance team. See panel retrofit work for the typical process.
What should I send to get a quotation?
Send the single-line diagram with metering points marked, the CT ratios if known, the communication requirement and the delivery location. If your plant monitors energy centrally, include the protocol it expects.
Need Elcontrol panel energy meters in Saudi Arabia fitted to your board? Send the single-line diagram and a quotation follows within one working day.
